Plans and Structure Review
Review available plans, roof geometry, pitch, valleys, walls, penetrations, drainage, access and construction schedule before setting the scope.
Licensed and Insured - Lic. #364022
Call for Free Inspection - (505) 324-1094
(505) 324-1094
mymail@mailservice.com
Build the roof correctly from the start with a complete system planned around the structure—not a material package dropped onto the deck. Magic Roofing coordinates roof design, deck readiness, drainage, flashing, ventilation and material selection for new homes, additions and detached structures in Farmington and San Juan County.
Planning a new home, addition, garage or major renovation? Send the address, plans and anticipated schedule so Magic Roofing can review fit and availability.




Short answer: New roof installation applies when a structure does not yet have a finished roofing system, including new homes, additions, garages and major rebuilds. The roofer should review slope, deck conditions, transitions, ventilation and drainage before installation—not after conflicting details are already built.
Roofing material alone is not a complete installation. Long-term performance depends on deck readiness, water-shedding layers, ventilation, flashing, penetrations, transitions and drainage. The written scope should define responsibilities, installation requirements, schedule dependencies and warranty conditions.
Review available plans, roof geometry, pitch, valleys, walls, penetrations, drainage, access and construction schedule before setting the scope.
Select roofing, underlayment, flashing and ventilation components based on design, local exposure, appearance, maintenance expectations and budget.
Confirm the deck is complete, dry, properly fastened and compatible with the specified assembly before roofing materials cover it.
Install specified underlayment, edge details, valleys, wall flashing and penetration protection as required by the roof and selected system.
Install the selected shingles, metal, tile or low-slope membrane using the fastening, seaming and detail requirements for the assembly.
Remove roofing debris, complete the final roof review and provide applicable workmanship, manufacturer and project documentation.
The roofing schedule depends on plan readiness, dry-in requirements, deck completion, trade coordination, weather and material availability. Those dependencies can change timing, but responsibilities and next steps should never be a mystery.
Provide the property address, available plans, project type, builder contact and anticipated roofing schedule.
Review roof geometry, deck status, access, transitions, ventilation needs and coordination requirements.
Confirm the selected assembly, included work, exclusions, responsibilities, schedule and warranty terms.
Coordinate site protection and install the specified underlayment, flashing, ventilation and roofing system.
Clean the work area, review completed details and provide the applicable project documentation.
There is no universal “best roof” for every new Farmington structure. Roof pitch, architecture, structural capacity, wind exposure, heat, maintenance expectations and budget all matter. Magic Roofing can explain where each assembly fits and where it does not.
A practical installation option for many new homes and additions, with multiple styles and performance levels. Ventilation, underlayment and flashing remain critical.
Explore Shingle Roofing → Durable Metal SystemWell suited to many exposed structures when panel profile, fastening, expansion, snow movement, penetrations and edge details are planned together.
Explore Metal Roofing → Distinctive Roof OptionA durable, distinctive choice for compatible structures. Deck capacity, flashing, underlayment, fastening and walkability must be evaluated early.
Explore Tile Roofing → Specialized Low-Slope AreasPorches, additions and low-slope roof areas may need membrane assemblies coordinated with adjacent steep-slope roofing and wall transitions.
Explore Low-Slope Roofing →New Farmington roofs must be planned for intense sunlight, high winds, dust, hail, sudden storms and large temperature swings. Those conditions affect material selection, sealants, fasteners, flashing, ventilation and the transitions where roof sections meet.
An installation plan should account for the actual structure and site. That includes orientation, pitch, penetrations, drainage, attic design, deck specifications, surrounding terrain and the way wind and water move across the property.
A real installation price depends on the roof—not a generic price-per-square shortcut. The estimate should identify the selected assembly, scope boundaries, coordination requirements and how plan or field changes will be handled.
Roof size, pitch, height, access, material choice, flashing complexity, ventilation, penetrations, mobilization, schedule and construction coordination affect the final price.
Magic Roofing offers a 10-year residential workmanship warranty on qualifying projects. Manufacturer coverage varies by product, system and registration requirements.
Financing may be available for qualifying projects. Review the rate, term, fees, payment schedule and total repayment before choosing any financing program.
Want an early planning number? Use the online roof estimate only as an early planning reference, then submit plans and project details before treating any number as a final installation proposal.
Magic Roofing is based on Fairgrounds Road in Farmington. Farmington and San Juan County are the primary new roof installation market, with additional Four Corners availability depending on project size, scheduling, travel and applicable licensing.
Primary local service area. Owners and builders can request new roof installation review for homes, additions, detached garages, accessory structures and qualifying major renovations.
Regional service may be available for qualifying properties in northwestern New Mexico and surrounding Four Corners communities in Colorado, Arizona and Utah.
Do not assume availability from a city list alone. Send the property address and project details so Magic Roofing can confirm current service coverage.
New roof installation is performed on a new structure or roof area that does not already have a finished roofing system. Roof replacement removes and replaces an existing system. New installation requires earlier coordination with plans, decking and other trades.
As early as practical—ideally while roof geometry, penetrations, ventilation and transitions can still be reviewed. Early involvement helps identify conflicts before the deck is complete or roofing materials are ordered.
Provide the property address, available roof plans, roof areas and pitches, preferred material, anticipated deck-completion date, site access information and the owner or builder contact responsible for coordination.
No single material is best for every structure. Asphalt shingles, metal, tile and low-slope membranes solve different design needs. The right choice depends on pitch, structure, exposure, appearance, maintenance expectations and budget.
Those components are part of a complete roof assembly when included in the written scope. Exact responsibilities should be coordinated with the builder because decking, wall preparation, penetrations and some ventilation work may involve other trades.
Timing depends on roof size, pitch, height, material, site access, deck readiness, weather, inspections and coordination with other trades. The roofing schedule should be tied to actual construction readiness rather than a generic duration.
Magic Roofing offers a 10-year residential workmanship warranty on qualifying projects. Manufacturer warranties vary by product, assembly, credential and registration requirements. Review both workmanship and manufacturer terms before installation.
Financing may be available for qualifying projects. Approval, rates, terms, fees and program availability depend on the financing provider and applicant. Compare the total repayment—not only the monthly payment—before choosing a plan.
Farmington and San Juan County are Magic Roofing’s primary new roof installation area, including Aztec, Bloomfield, Kirtland, Flora Vista, La Plata and Navajo Dam. Qualifying Four Corners projects may be available based on scope and scheduling.
Tell Magic Roofing about the structure, available plans, roof material goals and construction schedule. The next step is a coordinated installation scope—not assumptions made after the project is already moving.